Production Process of Large Diameter Thick-walled Square Tube


Release time:

2019-09-20

Production process of large diameter thick-walled square tube are as follows:
The first step: Raw materials that strip, wire, flux. In the input before going through a rigorous physical and chemical testing.

The second step: The end of the strip butt joint, the use of single or double wire submerged arc welding, rolled into large diameter thick-walled square tube automatic submerged arc welding.

The third step: Before forming, strip through leveling, trimming, planing, surface cleaning and conveying to the bending treatment.

The fourth step: The use of electric contact pressure gauge control conveyor pressure on both sides of the press to ensure a smooth strip delivery.

The five step: The use of external control or roller molding. 

The six step: Large-diameter thick-walled square tube weld seam gap control device used to ensure the weld gap to meet the welding requirements, pipe diameter, the wrong side of the amount and weld gap have been strictly controlled.

The seventh step: Large-diameter thick-walled square tube wall welding is divided into internal and external welding, are used by the United States Lincoln welding machine for single-wire or double-wire submerged arc welding to obtain a stable welding specifications. 

The eighth step: Weld large-diameter thick-walled square tube welded continuous online ultrasonic testing after injury, to ensure that 100% of the spiral weld non-destructive testing coverage. If there are defects, automatic alarm and spray mark, the production workers so adjust the process parameters at any time, promptly eliminate defects. 

The nine step: The air plasma cutting machine will be cut into large single-tube thick-walled square tube.

Latest News

Bangladesh client Mr.Baki visits and inspects our factory

Recently,Mr. Baki came to our company to inspect, the general manager of the company and foreign trade department colleagues received the international friend.

2018-03-15

Linde Group Visit Shandong Jinding Stainless Steel Tube Co.,Ltd

Recently,Linde Group came our factory to inspect,they welcomed by the general manager of the company and foreign trade department colleagues.They visited the workshop,test machine,stainless steel coil

2018-03-15

Shandong Jinding STS Tube TS16949 certifcate issued by LRQA

ShandongJindingSTSTubegetTS16949issuedbyLQRALRQAisthefirstinspectionagencyintheworldanditsissuecertificateisknownasauthorityandauthentication.ShandongJindingSTSTubegettheissuedcertificatebyLRQAafterst

2018-03-15

PED Certificate Awarded to Shandong Jinding Stainless Steel Tube

PED Certificate Awarded to Shandong Jinding Stainless Steel Tube Shandong Jinding Stainless Steel Tube Co.,Ltd passed the LRQA audit and awarded PED certificates.

2018-03-15

Stainless Steel Tube trade assurance $108,000 credited by alibaba

Welcome to place order through alibaba trade assurance. Shandong Jinding Stainless Steel Tube amount is USD 108,000.00.Alibaba will fully cover this order amount.More details, send

2018-03-15