Fire Protection Measures for Seamless Steel Pipes
Release time:
2019-10-18
Seamless steel pipes usually lose their load carrying capacity at temperatures of 450 to 650 ° C, causing large deformations, resulting in bending of steel columns and steel beams. As a result, they cannot be used due to excessive deformation.The unfired seamless steel pipe has a fire resistance limit of about 15 minutes. The length of this time is also related to the speed at which the component absorbs heat. The fire protection measures for several different seamless steel pipes are described below.
1. The outer layer. It is to add an outer layer on the surface of the seamless steel pipe, which can be cast in place or sprayed. The cast-in-place solid concrete cladding is usually reinforced with steel mesh or steel to limit shrinkage cracks and to ensure the strength of the casing.
2. Fill the water. Filling the hollow seamless steel pipe is the most effective protection against fire. This method enables the seamless steel pipe to maintain a lower temperature in the fire, and the water circulates in the seamless steel pipe to absorb the heat of the material itself. The heated water can be recirculated after cooling, or cold water can be introduced from the pipeline to replace the heated water.
3. Shielding. The seamless steel pipe is placed in a wall or ceiling made of refractory material, or the component is hidden in the space between the two walls, and the fireproofing purpose can be achieved by adding a little refractory material or increasing it. This is the most economical way to fire.
At present, high-rise seamless steel pipe construction is increasing, especially for some super high-rise buildings, which use a wider range of seamless steel pipe materials. In the event of a fire accident in a high-rise building, the fire will not be extinguished in a short period of time. This requires us to increase the fire protection of the building materials during the design of the building to enhance its fire resistance and to develop the necessary emergency within the building. Program to reduce casualties and property damage.
Latest News
Bangladesh client Mr.Baki visits and inspects our factory
Recently,Mr. Baki came to our company to inspect, the general manager of the company and foreign trade department colleagues received the international friend.
2018-03-15
Linde Group Visit Shandong Jinding Stainless Steel Tube Co.,Ltd
Recently,Linde Group came our factory to inspect,they welcomed by the general manager of the company and foreign trade department colleagues.They visited the workshop,test machine,stainless steel coil
2018-03-15
Shandong Jinding STS Tube TS16949 certifcate issued by LRQA
ShandongJindingSTSTubegetTS16949issuedbyLQRALRQAisthefirstinspectionagencyintheworldanditsissuecertificateisknownasauthorityandauthentication.ShandongJindingSTSTubegettheissuedcertificatebyLRQAafterst
2018-03-15
PED Certificate Awarded to Shandong Jinding Stainless Steel Tube
PED Certificate Awarded to Shandong Jinding Stainless Steel Tube Shandong Jinding Stainless Steel Tube Co.,Ltd passed the LRQA audit and awarded PED certificates.
2018-03-15
Stainless Steel Tube trade assurance $108,000 credited by alibaba
Welcome to place order through alibaba trade assurance. Shandong Jinding Stainless Steel Tube amount is USD 108,000.00.Alibaba will fully cover this order amount.More details, send
2018-03-15