45# Seamless Steel Pipe Defect Control


Release time:

2019-12-31

1. Control the carbon content in the steel as much as possible to avoid the peritectic reaction zone and the upper or lower control limits.
2. The vibration stability should be monitored to ensure that the lateral deflection of the vibration is not more than 0.2 mm and the longitudinal deflection is not more than 0.4 mm.
3. Strict nozzle assembly ensures good nozzle alignment, prevents drift, and ensures uniform solidification of shaped pipes.
4. Improve the accuracy of the fan section, especially the mold and the zero part. If severe bending is found, replace the zero part of the pinch roller.
5. Control the superheat of the steel in the 45# seamless steel tube, determine the appropriate drawing speed system, and prevent the outer casing from being too hot and the drawing speed too thin.

6. Select the appropriate slag according to the characteristics of the special steel pipe, appropriately increase the viscosity of the mold slag, improve the heat transfer uniformity of the protective slag, and have fewer principles when adding the protective slag.

7. Appropriately increase the degree of contact between the narrow-foot roller and the slab to prevent the 45# seamless steel pipe from protruding, but the foot roller should not be adjusted too hard, otherwise it may cause great resistance to the casting.

8. Ensure the water gap of the crystallizer is uniform, improve the quality of the crystallizer equipment, prevent the crystallizer from being seriously worn and the coating from falling off, realize the weak cooling of the crystallizer, and reasonably control the cooling strength.
9. In order to prevent large declination of severe depression, the maintenance of the hydraulic system of the fan section should be done, on-site inspection to prevent hydraulic loss or fan section lifting, improve the quality of the fan-shaped partial pressure roller and conduct daily on-site inspection to prevent compression. The roller breaks and the machine is stopped immediately after the deviation angle is severely depressed to avoid excessive loss. After the shutdown, the hydraulic system is faulty or the sector is replaced.

 

 

Latest News

Bangladesh client Mr.Baki visits and inspects our factory

Recently,Mr. Baki came to our company to inspect, the general manager of the company and foreign trade department colleagues received the international friend.

2018-03-15

Linde Group Visit Shandong Jinding Stainless Steel Tube Co.,Ltd

Recently,Linde Group came our factory to inspect,they welcomed by the general manager of the company and foreign trade department colleagues.They visited the workshop,test machine,stainless steel coil

2018-03-15

Shandong Jinding STS Tube TS16949 certifcate issued by LRQA

ShandongJindingSTSTubegetTS16949issuedbyLQRALRQAisthefirstinspectionagencyintheworldanditsissuecertificateisknownasauthorityandauthentication.ShandongJindingSTSTubegettheissuedcertificatebyLRQAafterst

2018-03-15

PED Certificate Awarded to Shandong Jinding Stainless Steel Tube

PED Certificate Awarded to Shandong Jinding Stainless Steel Tube Shandong Jinding Stainless Steel Tube Co.,Ltd passed the LRQA audit and awarded PED certificates.

2018-03-15

Stainless Steel Tube trade assurance $108,000 credited by alibaba

Welcome to place order through alibaba trade assurance. Shandong Jinding Stainless Steel Tube amount is USD 108,000.00.Alibaba will fully cover this order amount.More details, send

2018-03-15